Drilling Rig Crew Jobs in Saudi Arabia

About Arabian drilling company

 Arabian drilling company is one of the leading Petroleum services company in Saudi Arabia and  the Middle East, North Africa region
Arabian Drilling Company was established in 1964 through the joint venture between the Industrialization & Energy Services  Company (TAQA) which owns 51% and Services Petroliers Schlumberger S.A., a global leader in oilfield services which owns the remaining 49%
Schlumberger Exam for Roustabout, Floorman, Derrickman And Driller 2017

Arabian Drilling Company Jobs

"Rig Manager "Toolpusher
" Assistant Rig Manager "Night Pusher
Driller
 PMS Electrical
 PMS Mechanic
 Chief Electrician
 Chief Mechanic

Arabian Drilling Company Email Address

Arabian Drilling Company Address

Address: 4110, Al-Khobar 31952, Kingdom of Saudi Arabia
Tel: +966-13-887-2020
Fax: +966-13-882-6588

Website: https://arabdrill.com

Arabian Drilling Company Emails

Jobs-expat-adc@arabdrill.com
vnambiar@slb.com
Talal20_rec@yahoo.com


: Links to Positions

https://arabdrill.com/human-resources/career


How to Apply

You can apply for the job by clicking the link above and knowing all the details

and By sending your own CV on this email
Jobs-expat-adc@arabdrill.com
You can also like The Most Important Questions For Oil Companies In The World



Great Opportunityes at Suncor Energy- 20+ positions JUST got posted


Suncor Energy is a Canadian integrated energy company based in Calgary, Alberta now hiring for various position and qualified personnel in Oxnard, New Iberia, Houston, New Iberia and other areas in the United State of America, Suncor ranks number 134 in the Forbes Global 2000 list


: What Suncor Energy Company Is Hiring For

Heavy Equipment Operator, Tailings, Geotechnical Engineer, Senior Contracts Analyst, Operator, Co-op Student, Accounting and Finance, Co-op Student, Business, Co-op Student, Petroleum Engineering, Co-op Student, Civil Engineering, Co-op Student, Mining Engineering, Lead, Product Safety, Heavy Equipment Technician, Mine Equipment Maintenance

: Links to Positions

Heavy Equipment Operator
Geotechnical Engineer
Senior Contracts Analyst
Operator, Co-op Student Accounting and Finance
Co-op Student, Petroleum Engineering
Co-op Student, Civil Engineering
Co-op Student, Mining Engineering
Application Engineer
Technician, Laboratory
Engineer, Process
For all jobs, you can apply from this link
www.jobs.suncor.com/search
: Suncor Energy company Email
investor contact: invest@suncor.com
Advertising contact: brandmgmt@suncor.com
Aboriginal Business contact: aboriginal.business@suncor.com
You can apply for this jobs by clicking the link above or  By  sending your own CV to this emails: invest@suncor.com




Cactus Drilling Company Jobs in Texas, Oklahoma and New Mexico

Cactus Drilling Company is the largest privately-held domestic
 land drilling contractor in the United States, The company was founded in 2002 and is based in Oklahoma City and now  hiring for the various position and qualified personnel in Louisiana, New  Mexico, Oklahoma and Texas


Contact Information

Cactus Drilling company Address: 8300 SW 15th Oklahoma City, OK 73128­‐9594

Cactus Drilling company Phone: 405 577 5347

: Cactus Drilling company Email

Service Department Email: MikeHer@cactusdrlg.com

Electrician Department Email: HaroldH@cactusdrlg.com

Schlumberger Exam for Roustabout, Floorman, Derrickman And Driller


Event Name: Hiring Floor hand For Drilling Rigs In Texas, Oklahoma and New Mexico


LocationArbor Hotel and Conference Center - Lubbock ,TX

Date: Thursday / June 21st

Time: Open Interviews 8:00 - 5:00

Arbor Hotel Address: 640162nd street, Lubbock, Texas

How to apply

You can apply for any jobs through this application www.apply.cactusdrilling.com or by sending a CV via this company Email: MikeHer@cactusdrlg.com

  Careers

Yard Hand-
Floor Hand-
Lead Tong Head-
Motorman-
Derrick Hand-
Driller-
Service Department Mechanics and Techs-
Electrician-

The Link For All Careers
www.cactusdrlg.com/careers


The Most Important Questions For Oil Companies In The World

Operation Exam For Expro Petroleum Company In Algeria

Operation Exam For Expro Petroleum Company In Algeria


1- State the meaning of resolution relating to a pressure sensor for 
 example?

2- State Ohm's law showing a relationship between current, voltage & 
resistance?

3- state Boyle's law  showing a relationship between pressure and volume

4- How would you calculate the slope (gradient) of a straight line on standard x,y graph?

5- State the units & abbreviations for the following measurements:

A- Capacitance 
B- Frequency
C- Time

you also like this Exam National Drilling Company Exam and answer 2017

6- What is the volume of cylinder pipe measuring 3 meters long with a diameter of 10 cm? pi=3.14 give an answer in cm3

7- If a well is flowing at steady state rate of 100 barrels of oil per hour then what volume of oil produced after 2 days of constant flow?

8- What is GOR (gas oil ratio )for a well producing? million standard cubic feet of gas per day and 100 barrels of per hours give an answer in units of SCF/bbl to 3 decimal places?

This is screenshot For some questions



  
9- If pressure gauge No 1 needs 1200 psi and gauge No 2 needs 70 bar which is the higher pressure give that 1 bar =14.5 psi?

10- Give the density = mass/volume what is the mass of steel ball bearing of volume 0.5 cm3 and density of 2 gram/ cm3?

11- which of the following is True or False :

A- All Expro we are all required to work in as quickly as possible with no regard for safety ?

B- All Expro we are all required to work safety

C- All Expro people in the office are more important than the people working in the field?

D- All Expro we are encouraged to ask questions when we are unsure of correct procedure?

You also like Schlumberger Exam For Safety Engineer and answer

12- Name 5 different hand tools commonly used in the oil field?

13- What would you do if you observed as a person working in an unsafe manner?

14- How does an electron move in a continuous current?

you can Download All Exam and answers from this link 



Operation Exam For Expro Petroleum Company In Algeria


The Most Important Questions For Oil Companies In The World




1-  What are factors affect the penetration rates?

a)   ………………………………………………
b)  ………………………………………………
c)   ………………………………………………
d)   ………………………………………………

2-  What is the problem in each of the following:

a)  Pressure drop while drilling
……………………………………
……………………………………
b)  You have losses while drilling and gain when pump stopped
…………………………………………
c)  Reduction of weight indicator reading while tripping out of hole
…………………………………………
d)  Reduction of weight indicator reading while tripping in hole
…………………………………………
e)  You have an influx and SICP is lower than SIDPP
…………………………………………
f)    You have pit gain, reduction in bottom hole pressure, no influx
……………………………………………………

3-  What is the maximum weight that can be used from the BHA for WOB? Why?

…………………………………………
…………………………………………


5-  What should you do in each of the following cases:

a)You have differential stuck
…………………………………………
b)You have mechanical stuck (tight hole)
…………………………………………
c)While pulling out of hole (tripping out) you got 50 
bbl. gai
…………………………………………
d) If you have stuck in salt formation
…………………………………………

6- What is the maximum allowable over pull while POOH in vertical and horizontal well
…………………………………………

7-  We can use separator while drilling instead of vacuum degassed? Why

a- True                                   b- false 

8- How to use top drive function to make a connection?
…………………………………………
………………………………………….

9- d) Different types of brake?

………………………………………… 

you can also like this exam

Schlumberger Exam For Safety Engineer

And this Exam
Baker Hughes Mud Engineer Interview Questions and answer
10- What is the idea behind drill line slip & cut program? List all steps for making slip and cut?
………………………………………
…………………………………………
…………………………………………
…………………………………………

11- 1f connection gas is noticed while drilling, what would be considered to be a good drilling practices if an increase in mud weight is not an option at this time?

a. Flow check for longer during connection.
b.Increase drilling rate to get through zone quicker.
c.Control drilling rate to ensure only one slug of gas in annulus at any time.
d.Minimize connection time.
e.C & D.

12- Why should the well be closed in quickly after a kick has been detected?

Choose three
a.Minimize the influx into the well bore
b.Minimize the SICP
d.Minimize the bottom hole press.
e.Minimize the casing shoe pressure.

13- What is the most important step in blowout prevention once a warning sign has been detected?

a.Start circulation with pre calculated rate and kill the well with barite. 
b.Shut the blowout preventer
c.Pull to the shoe quickly.
d.Call the tool pusher and company man. 
e.Close the well in properly

14-If the formation pressure gradient increases from 0.60 psi/ft at 12000 ft to 0.62 psi/ft at 12700 ft, and the mud weight is 12 ppg through the interval, the

a.Overbalance increases by about 288 psi
b.Overbalance remains constant since mud weight not changed
c- Overbalance is reduced by 51 psi
d.Overbalance is reduced by 237 psi

15-  If the negative pressure loss is 100 psi while pulling pipe, and if the formation pressure gradient 0.75 psi/ft at 9000 ft , and the mud gradient 0.764 psi/ft the well would:

a.Flow and require a higher trip margin
b.Would remain static throughout the trip. 
c.Flow when pump stop
d. Be over pressured and lost circulation occurs
you can also like this exam

Nabors Company Exam and Answer 2018

19-  Pump stroke counter is the accurate to measure the mud to keep the hole full when P.O.O.H.

a )true                            b )false

20- On mud pump, oil level for both gear box and chains should be checked

a-  Weekly               b-     Daily                c- Each Tour

21- Pump speed increases as the pressure loading is:

a-    Decreased          b-   Increased

22- It is Okay to install a worn valve in a new seat.

a-      False           b-    True

23- The sand trap compartment below the shale shaker is a very important part of the mud /solids separation.

a-  False          b-  True

24- Which of the following should increase by increasing bit weight?

a- Penetration rate.                                          b- Hole deviation.
c- Tooth and bearing wear rate.                      d- Hydraulic horsepower.

25-What causes chip hold down?

a- The greater compressive strength of older rock formation
b- A high differential pressure between the mud and the formation c- Excessive weight on a dull bit.
d- All of the above.

26- What are the causes of shale to sloughs into the hole?

a ) Mechanical vibration of drill string .
b ) In-correct mud parameter ( high water loss and mud weight )
c ) Deviation angle . d ) All the above .

you can also like

Nabors Company Exam and answer 2018

27- Why drillers do break circulation going in hole?
…………………………………………
…………………………………………

28- The driller’s decision to pull a worn drill bit should be based on:

a- Other bit records in the area.                 
b- The rotary torque requirements. 
c- The drilling rate                                        
d- All of the above.

29- If the mud checked with V-G meter and the following numbers recorded, at 600 RPM is 85 & at 300 RPM is 50 .What would the yield value be ?

a- 25  LB.F/100 FT2                     
b- 35  LB.F/100 FT2
c- 5  LB.F/100 FT2    
d- 15  LB.F/100 FT2

31-  When gas is percolating the correct gauge to monitor / to maintain constant BHP during the weighting up period is:

a.Casing pressure gauge
b.Drill pipe pressure gauge
c.Bottom hole pressure gauge
d.Company man’s pressure gauge


33- Surface inside BOP equipment (Kelly safety valve) should 
not be tested when BOP’s are tested.

a- False                                                b- True

34- If the annulus and drill pipes are in communication, a choke adjustment on the annulus will reflect a change on the drill pipe side.

a- False                                                b- True

35- If the viscosity is low and if the drilling assembly is not balled up there is no negative pressure loss.

a- False                                                b- True

36- Vacuum pump on the degasser compresses gas inside the vacuum tank.

a- False                                                b- True

37-  When the three way valve is fully open, the vacuum in the vacuum tank is broken and less mud pulled in.

a- False                                                            b- True

38-  The main purpose of the discharge jet is to remove gas from the mud.

a- True                                                             b-  False

39-  The main purpose of the baffle plate in vacuum degasser is to allow the mud to form as a thin layer so the vacuum can pull gas out of the mud.

a-  False                                                          b-  True

40-  Use an “S” to indicate which of the following statements apply to soft formation bits or “H” to indicate statements applies to hard formation bits.

a-  . . . .A long tooth bit
b-  . . . .It can be safety used at high RPM
c-  . . . .It can damage drill pipe and itself if rotated too fast

you can also like this exam

National Drilling Company Exam and answer 2017

Download this exam from this link